Leitz-Park, Wetzlar
Reference description
Leitz-Park - 3rd BA building H
Wilhelm Theis GmbH implemented the heating and cooling supply for buildings H and W in Leitz Park. Specific producers and their services can be found in further explanations.
The special feature of the 3rd BA building H is the simultaneous generation of heat and electricity, which ensures the base load of the building. In addition, the hotel is supplied remotely with heating water and hot water.
Leitz-Park - 3rd BA building W
In the 3rd building W, the special feature of the bivalent heating and cooling supply by two heat pumps is shown. Here, the environmental energy can be used in terms of control technology to cool and heat both with free cooling without the use of heat pumps and without free cooling using bivalent heat pumps . In heating mode, the heat pumps can again be operated as a base load with and without boiler support.
Construction board
Client:
Leitz Park GmbH, Wetzlar
Location
Am Leitz Park 5, 35578 Wetzlar
Users
Leica Camera AG, Wetzlar
Architect:
Gruber + Kleine-Kraneburg Architects
buero@gruber-kleinekraneburg.de
www.gruber-kleinekraneburg.de
General planner
Gruber + Kleine-Kraneburg Architects
General contractor
ARGE new building Leica Camera Wetzlar
International competition
2007
construction time
2012 - 2014
Completion
03/2014